Serious Questions About Thar Coal



  • http://jang.com.pk/jang/sep2012-daily/04-09-2012/col4.htm

    A scientist has raised serious questions about Dr.Samar's thar coal project.

    I am a layman . I think if thar coal is so attractive then why foriegn companies haven't shown any interest in this project as these reserves are in relatively calm areas where there is not much law and order issue.



  • SA

    There are many national issues on which even media is very silent. Recently, water technology story has also gone to some grave.



  • Few months i started a thread about Dr.Samar's statement that solar energy will work only in day , what will u do in the night :)

    I am just astonished that how come this man is sitting on the top scientiest post ?



  • Thar Coal is just another over-hyped project. The problem with such hype is that un-realistic expectations are created and when these do not materialize, we start pointing fingers towards 'invisible' hands.

    The Thar Coal topic has already been well-discussed in a previous thread.



  • I have gone through the link provided above, one doctor scientist from Punjab University has provided his input which I do not differ. However, he has given the scenario of Block 3. What about Block 1 and block 2, where the feasibility report shows that huge quantity of water is required for open pit excavation.

    About Dr. Samar Mind project, I also doubt very much. He has succeeded in producing coal gas fuel for generating electricity. We do not hear after than about any further progress except Dr. Mind statement that a further fund of two million dollars is required to commercially operate the system.

    China was intially interested in the project but terms and conditions could not be finalized in the Musharraf regime and they simply backed out. Rumors were that more than usual kickbacks were demanded from Chinese companies. World Bank, IMF and USAID would not grant loan because this project is against global warming charter and is environmental hazard. So we remain what we are.



  • Information is sometimes in the greatest interests of the nation, but it is suppressed for some or other reason.



  • Imtiaz Sahib,

    Agreed that USAID , worldbank etc won't fund but if project has got potential , multinationals would have jumped straight way specially when during last 5 years when world has seen unprecedented oil prices.



  • ثمر مبارک کی بات سنو تو لگتا ہے کہ مسلہ ہی کوئی نہیں ، جیسے دودھ والا که رہا ہو کہ جتنی بھینسیں ہونگی اتنا ہی دودھ نکلے گا ،ایک ارب پیسے دو سو میگا واٹ لے لو



  • میرے خیال میں تھر کول کے منصوبے کو جذبات سے ہٹ کر سمجھنا چاہئے

    اس کے ساتھ ساتھ ہمیں اس بات کو بھی سمجھنے کی کوشش کرنی ہو گی کہ کہیں اس منصوبے کے خلاف آئل لابی تو سر گرم نہیں ہے

    اس منصوبے کی وجہ سے کئی لوگوں کے مفادات خطرے میں ہیں اور اس بات کو جذبات سے ہٹ کر اور سیاسی بصیرت اور مہارت کا مظاہرہ کرتے ہوۓ سمجھنا چاہئے

    ہو سکتا ہے کہ مضمون نگار صحیح کہہ رہے ہوں اور انہوں نے صحیح طرح کے سوال اٹھائے ہیں ، لیکن اتنا انتظار کیوں کیا ، جبکہ تھر گیس کول منصوبہ اپنے آخری مرحلے میں ہے

    یہ مغربی کمپنیوں کا مسلمہ طریقہ کار ہے کہہ اگر کسی مقامی منصوبے سے ان کے کاروباری مفادات کو خطرہ محسوس ہو تو وہ اس منصوبے کے خلاف براہ راست اقدام کرنے کی بجائے ماہرین کی رائے کے ذریعے اس کو ناقابل عمل اور فضول قرار دلوا دیتے ہیں

    اگر کوئی اس بات کی معلومات فراہم کر سکے کہ مضمون نگار کا پس منظر کیا ہے ، کہاں سے تعلیم حاصل کی ہے ، کہاں پڑ کام کرتے رہے ہیں اور کون سی آئل یا گیس کی کمپنی سے منسلک رہے ہیں تو کافی کچھ سمجھ آ سکتا ہے

    ف ج



  • I agree, many questions were raised by Dr. Samar's claims regarding Thar Coal.

    This thread contains some good discussion over the topic. Some domain experts also contributed in this thread

    http://pkpolitics.com/discuss/topic/what-is-stopping-thar-coal-project